New Build 2018/19

Proposed buildings for Christleton International Studio

Plans for our new school building have been approved and developments are making good progress. The building will be situated on the same campus as the existing building, sharing a site with Queen’s Park High School.

Although CIS runs as a separate entity to Queen’s Park, the new building has been designed on the principles of infill development in order to maintain the landscape characteristic of Queen’s Park Edwardian Girl’s and InterWar Boys’ School. The design will complement the historical features along the front of the building, whilst adding a fresh and modern look.

We hope to accommodate for 320 of students through utilising unused space on the existing campus. We aim to provide a variety of spaces that can accommodate di?ering student numbers, be it groups of 30 or smaller more intimate break out groups.

The construction period will operate over 31 weeks. The building should be expected to be completed by December 2018; The new facility will be in operation by January 2019.